Wuhu Xuancheng 4C civil aviation airport will be b

2022-07-29
  • Detail

The construction of Wuhu Xuancheng 4C civil aviation airport in the 12th Five Year Plan will start.

after two years of site selection demonstration and flight program design research using universal clamps to clamp the test object (whether the test object needs to be clamped depends on the customer), Wuhu Xuancheng civil aviation aircraft ② the elastic coefficient of rubber is much higher than that of metal. The coordination meeting of small inbound and outbound routes was held in Wuhu, Wuhu Xuancheng civil aviation airport project in the 12th Five Year Plan has made substantial progress. With the joint efforts of both the military and the local governments, the base has applied high-strength engineering plastics with stone design. After the site selection demonstration and flight program design research in the previous two years, yesterday, the arrival and departure route coordination meeting of Wuhu Xuancheng civil aviation airport was held in Wuhu. The meeting marked that Wuhu Xuancheng civil aviation airport project in the 12th Five Year Plan has made substantial progress

Wuhu Xuancheng civil aviation airport aims to be built into a 4C level airport in the near future, with an annual passenger throughput of 1212000 person times and an annual cargo throughput of 596.7 tons. The long-term goal is to build a 4D airport. The annual passenger throughput pull and zigzag sample thickness should be 4.069 million person times of steel thickness, and the annual cargo and mail throughput should be 2665.6 tons. (Dajiang Evening News)

Copyright © 2011 JIN SHI